Review a business continuity plan at a defined interval and when a material change challenges its assumptions. A calendar reminder can organise the review, but a service may change well before that reminder arrives. The useful question is whether the plan still describes a recoverable service at the level the business needs.

For South African teams, the University of Cape Town's June 2024 Business Continuity Policy provides a public example of linking continuity to operations, testing, management decisions and continual improvement. Its annual activities are institutional commitments for UCT, not a universal statutory review interval for South African businesses. UCT Business Continuity Policy

Set an interval and a change route

Choose the planned review interval with the service owner, taking account of consequences, applicable obligations and the pace of change. Record the reason for the interval. A high-impact service with frequent changes may need closer attention than a stable, lower-impact process.

Alongside that interval, establish a route from operating changes to the continuity owner. Relevant changes include a new application, location, supplier arrangement, operating hours, workload or dependency. A change need not cause an incident to make a recovery assumption obsolete.

Identify who screens the change, who examines its continuity effect and who can approve revised priorities or resources. Put that responsibility into the existing change process, so continuity review does not depend on someone remembering a separate document months later.

Compare the service that the plan assumes

Begin with the previous approved service description. What work must continue during disruption? What capacity and time limits were accepted? Which people, information, facilities and systems were assumed to be available? Compare those assumptions with the proposed or completed operating change.

UCT's policy describes continuity in terms of acceptable timeframes and predefined capacity during disruption. That is a useful reminder to examine the service delivered, rather than treating an available application as the entire outcome. Its scope and governance remain specific to the university. UCT policy and definitions

Changed assumptionReview questionUseful evidence
Workload or opening hoursDoes the fallback still support the required serviceUpdated volumes and a bounded capacity check
Application or interfaceCan people use the recovered process end to endA controlled test of the affected dependency
Location or responsibilityAre facilities, access and authority still availableConfirmed arrangements and assigned roles

The matrix is an original review aid. It does not prescribe a recovery time or a legal notification deadline. Keep assumptions identifiable so an owner can approve, revise or reject them individually.

A supplier's contractual recovery promise may concern only its own component. Check the interfaces and responsibilities that connect that promise to your service. Avoid declaring the whole process recoverable because each team has separately reported that its part is ready.

Choose the evidence needed to approve a change

A document check can establish that contact details, references and responsibilities are consistent. A discussion exercise can expose uncertainty about decisions. A technical test can provide evidence about an observed recovery operation. Choose the method that answers the changed assumption, and state its limits.

NIST's information-system contingency guidance distinguishes several recovery approaches, including alternate equipment, alternative locations and manual processing, and includes plan maintenance within its planning process. These are US planning resources, not South African legal duties. Their value here is the connection between the recovery approach and the arrangement that must remain usable. NIST contingency planning

For a revised manual route, check who can perform the work, what information they need, how long the route can operate and what cannot proceed safely. For a changed integration, agree a controlled test with competent technical staff. Protect live operations, personal information and approval controls during verification.

Use a recovery tabletop when coordination or authority needs examination. The existing guide addresses US and Canadian discussion exercises; its distinction between a discussion and measured recovery is useful here, but it does not establish local reporting requirements.

A workload change that invalidates the old assumption

Fictional change review. A service previously needed to process 30 priority cases per day during disruption. A new contract increases the minimum to 50. The existing continuity plan describes a manual route for 36 cases per day, based on its older planning assumptions.

The comparison is 50 required − 36 planned capacity = 14 cases per day not covered. Over two days the arithmetic gap would be 28 cases, assuming constant demand, no backlog carried in and no other processing route. These are scenario assumptions, not measured capability.

Review fieldCompleted illustrative entry
TriggerNew contract changes minimum service demand
Affected assumptionExisting manual route sufficient for priority cases
Evidence statusOld planning estimate; no current capacity test supplied
DecisionPrevious sufficiency conclusion cannot be carried forward
Next evidenceSafe, authorised check of capacity and controls under the changed workload
OwnerBusiness service owner, supported by continuity and operations leads

The owner must address both problems: the numerical shortfall and the absence of current capability evidence. Renaming the plan or increasing its stated capacity to 50 resolves neither. Possible responses include resources, a revised service arrangement or an authorised treatment of the gap, subject to actual commitments.

No annual review interval excuses ignoring the change. This example is a decision aid, not a statutory review schedule or evidence that manual processing is suitable for the real service.

Keep uncertainty visible until the plan is usable

Record the change reference, affected assumptions, evidence inspected, unresolved questions and decision-maker. If the new arrangement has not been tested, say so. Do not replace the old plan with a polished document that quietly assumes an unproven capability.

A review can conclude that no revision is needed, but the record should explain why the changed operation leaves the recovery arrangement valid. Where a revision is required, name an owner, a completion condition and the evidence needed to close it.

Update the controlled plan and communicate the relevant changes to people who would use it during disruption. Check that approved instructions can be found when normal systems are unavailable. Superseded copies should be handled through the organisation's document controls.

Preserve the distinction between a planned capability, a demonstrated capability and a remaining gap. Management can then decide whether to limit the service, fund a change or accept a defined residual risk through its authorised process.

Questions about review frequency

Is an annual review always sufficient

No universal interval is established here. Apply relevant obligations and set a justified cadence, with additional review when material changes affect the plan.

Must every change trigger a full exercise

No. Screen its effect and choose proportionate evidence. A corrected contact reference and a redesigned recovery dependency require different checks.

Can the IT team approve the entire plan

Technical evidence supports the decision, but business service priorities and acceptable disruption need the appropriate business authority.

Sources and disclosure

UCT Business Continuity Policy GEN014 — June 2024 public institutional policy; checked 8 October 2026. Its requirements apply to UCT.

NIST contingency planning — US information-system planning overview, updated 22 June 2020; checked 8 October 2026.

QSE Advisory is part of the QSE Advisory brand family. Preparation was AI assisted. The review matrix and implementation method are editorial guidance, not reported testing or client results.

PUT THE METHOD TO WORK

Recovery tabletop decision record

Capture the service, recovery decision, evidence and business acceptance from an exercise.

This related worksheet supports part of the task. Adapt it to your evidence; it does not replace the method or specialist checks in this article.

Open the Recovery tabletop tab in the workbook. Start with its instructions and replace the clearly labelled illustrative example with your own information.

Download worksheets · XLSX · 25 KB

Instructions and limitations →

Reviewer & Assessor

Reviewed by Laraib Naveed Ahmad

Laraib Naveed Ahmad — CEO & Owner, Reviewer & Assessor.

View full profile →
CONTINUE THE CONVERSATION

The QSE Briefing

Selected ideas from across the publication, brought together in one thoughtful briefing.

Join the newsletter

Spotted an issue? Contact our editorial desk.