Do not add a master meter to the submeters it already contains. The master records electricity crossing one supply point; downstream meters divide or describe some of that same flow. Adding every available kWh row can turn a detailed record into an overstated total.
GHG Protocol's Scope 2 guidance uses purchased or acquired and consumed energy within the inventory boundary and identifies metered consumption or utility bills as activity-data sources. S1 The reconciliation below is QSE's proposed data control. It addresses duplicated physical consumption records, not the separate rules for electricity certificates or market-based claims.
Identify what each meter actually measures
Start with the approved reporting boundary and a facilities-confirmed supply diagram. Give each meter a stable identifier, physical location, parent supply if any, reading basis and covered period. Distinguish a cumulative register reading from the consumption difference between two readings. Match units before comparing a bill in MWh with a submeter export in kWh.
A meter ID or invoice number does not prove that two supplies are independent. Equally, a row called a submeter may sit under a different supply point. Confirm the physical relationship with the facilities owner. Keep evidence of that decision beside the rollup formula.
A completed fictional reconciliation
Example ELEC-026 covers one fictional site in September 2026. All meters cover the same dates and all listed supplies are within the company's established boundary. There is no onsite generation, export, battery flow or supply to another reporting entity in this simplified example.
| Meter record | September reading | Rollup treatment |
|---|---|---|
| M1: main site import | 120,000 kWh | Include once in site total |
| M1-A: workshop, downstream of M1 | 45,000 kWh | Internal allocation; already contained in M1 |
| M1-B: office, downstream of M1 | 30,000 kWh | Internal allocation; already contained in M1 |
| M2: independent store supply | 20,000 kWh | Include once in site total |
The site total is M1 + M2 = 140,000 kWh. Adding all four rows would produce 215,000 kWh, overstating consumption by 75,000 kWh. Relative to the correct site total, that is an overstatement of about 53.6%. Within M1 alone, adding its two children would produce 195,000 rather than 120,000 kWh: a 62.5% overstatement. The two percentages have different denominators.
M1's allocation reconciliation is 45,000 + 30,000 + 45,000 = 120,000 kWh. Label the final 45,000 kWh as an unallocated residual. It is not automatically common-area consumption. It may include unmetered loads, losses, timing differences or data problems, and needs investigation before being assigned to departments.
Show the emissions consequence without hiding the data error
Using a fictional factor of 0.25 kg CO2e/kWh solely to illustrate the effect, the correct 140,000 kWh becomes 35,000 kg CO2e. The duplicated 215,000 kWh becomes 53,750 kg CO2e. The invented factor is not a reporting recommendation. The 18,750 kg difference here results entirely from duplicated activity data.
| Closure control | Completed fictional entry |
|---|---|
| Site total | 140,000 kWh: M1 and independent M2 only |
| Department detail | M1-A and M1-B retained as allocations, not extra imports |
| Residual | 45,000 kWh under M1 remains unallocated; facilities owner to investigate |
| Duplicate protection | Landlord or departmental recharge records linked to their underlying supply rather than added again |
| Change trigger | Recheck hierarchy after a new tenant, meter replacement or supply alteration |
Cases that need more than this simple rollup
If part of the master supply serves another reporting entity, first determine the energy attributable to your own boundary; do not simply retain the whole master. If meter periods differ, align them or make and label an appropriate estimate before calculating a residual. A negative residual is a warning to examine dates, units, multipliers, meter rollover and topology.
Onsite generation, exports and storage require a fuller energy-flow reconciliation. An import meter alone may not describe all consumption, and an internal energy transfer is not automatically a new purchase. This example deliberately excludes those cases; it cannot settle their Scope 2 treatment.
For the next close, ask the facilities owner to sign off the meter hierarchy and ask the inventory owner to confirm the boundary. Then calculate the total from independent supplies, preserve downstream detail for allocation, and leave unresolved residuals visible.
Prepared with AI-assisted research and drafting. Reviewed by: QSE Advisory experts.
Sources
This article is general information. Verify current requirements and seek qualified advice for your specific circumstances.
Reviewed by QSE Advisory experts
Every article is researched, sourced and checked before publishing.
Editorial standards →